Strength of Our Production Unit

  1. Floor space 100,000 SFT equally divided in to 7 stored building
  2. Initially number of machines 500
  3. Manpower – executive 80, workers 700
  4. Range of production:
  • Woven
  • Knit
  1. Production capacity – in average
  • Woven – 8,000 pcs/day
  • Knit – 12,000 pcs/day
  1. Production time- 90-120 days from the date of PO received
  2. Terms of delivery – FOB/C&F
  3. Payment – L/c at sight, TT, Wire transfer

Equipment’s & Features:

  • Floor space – 14,000 SQF
  • Manpower -110 persons highly trained professionals
  • Chemical Effluent Treatment Plant (ETP)
  • Production capacity – 650,000 pcs per month
  • Machineries – Total 37 Nos. Washing 10 Nos, Sample 02 Nos, Hydro 04 Nos, Dryer 11 Nos, Woven 01 Nos, 3D machine 06 Nos, PP spray 04 Nos.
  • Vehicle – 07 Nos
  • Generator – 280 KVA 01 Nos
  • Boiler – 05Kg 01 Nos (License # 5071, 91 SFT)
  • Dry process – whiskers, Brush, Wrinkle, Taking, PP Spray, Destroy
  • Wet process – Desize, Enzyme, Bleach, Silicon, Softener, Random, Acid, Towel, Dip dye, Cool dye, Over dye, Color spray, Tie dye.
  • Environment friendly workplace that assures the health and safety of employees with sufficient toilets, first aid, dining hall and medical bed.
  • A strong R&D team constantly innovate and keep up-to-date with changing trends